Search
Search
Страницы
Записи
  • UA
  • EN
  • UA
  • Executive summary of studies for synchronous interconnection of grids of continental Europe and Ukraine/Moldova

    A short executive summary of the steady state and dynamic stability studies of Ukrainian and Moldovan power systems operating synchronously with the power system of Continental Europe is provided by the Catalogue of Measures, constituting an integral part of the Agreement on the conditions for the future interconnection of the power system of Ukraine with ENTSO-E Continental Europe. The studies were conducted by the ENTSO-E TSO Consortium, with which NPC Ukrenergo signed a relevant Service Contract in 2019.

    The main purpose of the studies is to investigate the possibility of synchronisation of the power systems of Ukraine and Moldova with the power system of Continental Europe, as well as to identify possible technical obstacles to synchronisation and countermeasures to eliminate them. The studies were preceded by significant work performed by NPC Ukrenergo during 2019-2020. In particular, tests were conducted at 11 units of 8 Ukrainian TPP, CHPP and HPP, as well as at four units of NPP. The tests results, together with all other necessary data, were submitted to the Consortium to create a mathematical model of the power systems and conduct relevant studies. All the performed work ensured that NPC Ukrenergo complied with the requirements of the Catalogue of Measures in terms of conducting studies on the possibility of synchronisation, which resulted in a positive opinion of the Consortium.

     

    eng_UMPSI+

     

    To download Executive summary of studies for synchronous interconnection of grids of continental Europe and Ukraine/Moldova click here.