  • REGARDING THE ASSIGNMENT OF EIC-CODES TO NEW MARKET PARTICIPANTS

    On April 19, 2018, the Electricity Commercial Metering Code (hereinafter referred to as the CMC), approved by Resolution of the NEURC No. 331 dated March 14, 2018, entered into force. Within the frames of the authority to provide explanations regarding the provisions of the CMC (subparagraph 3 of paragraph 1.2 of Chapter 1 of Section II), we hereby inform you on the following.

    Paragraphs 5.1 and 5.2 of Chapter 5 of Section XIII of the CMC provide for the procedure of initial assignment of EIC-codes to the new electricity market participants.

    Thus, by May 19, 2018, the business entities performing activities in the field of energy by the type of activity “power transmission by local grids” (distribution system operators) and “power generation” (representatives of generating units) have to receive personal EIC-codes of X-type.

    Subsequently, within a month from the date of the receipt of personal EIC-codes of X-type, the business entities performing activities in the field of energy by the type of “power generation” (representatives of generating units) have to receive EIC-codes of W-type for their own generation units, namely power plants and separate power units with the capacity of 75 MW and more (type D as defined in paragraph 2.1 of Chapter 2 of Section III of the Distribution System Code), and EIC-codes of Z-type for their related commercial metering points.

    The received Z-type EIC-codes have to be transferred to the Commercial Metering Administrator.

    All EIC-codes are assigned by the Local Issuing Authority, currently by SE “Energorynok,” at the request of business entities.

    When applying for EIC-codes to the Local Issuing Authority, the following requirements for the content of the code fields must be taken into account.

    When using full and abbreviated plant type names, be guided by the following definitions.

    Code Type Field Requirements to the field content
    Х Party Name

    (identification object)

    Latin transliteration of the company’s full name in capital and lowercase letters (up to 70 characters)
    Х Display Name

    (abbreviated title)

    Latin transliteration of the company’s abbreviated name in capital letters (up to 16 characters)
    Х Vat Code

    (VAT code)

    «UA» + the company’s tax code
    Х Postal Code

    (postal code)

    Postal code of the company’s legal address
    Х Function

    (functional role)

    «Grid Operator» – distribution system operators

    «Producer» – representatives of generation units

    W Resource Object Name

    (identification object)

    Power plant – Latin transliteration in capital and lowercase letters of the unique plant name + full plant type name in English.

    Power unit – Latin transliteration of the plant full name + «_Unit» + power unit No.

    Turbine generator in the power unit (in the case of more than one turbine generator per unit) – Latin transliteration of the full name of the power unit + «_Тurbine» + turbine generator No. (up to 70 characters)

    W Display Name

    (abbreviated name)

    Power plant – Latin transliteration in capital letters of the abbreviated unique plant name + abbreviated plant type name in English.

    Power unit – Latin transliteration of the abbreviated plant name + «_UN» + power unit No.

    Turbine generator in the power unit (in the case of more than one turbine generator per unit) – Latin transliteration of the abbreviated name of the power unit + «_ТB» + turbine generator No. (up to 16 characters)

    W Eic Parent

    (parent code)

    Power unit – EIC-code of W-type for power plant

    Turbine generator – EIC-code of W-type for power unit

    W Eic Responsible

    (responsible party)

    EIC-code of Х-type for business entity – owner
    W Postal Code

    (postal code)

    Postal code of the actual address of the object’s location
    W Function

    (functional role)

    «Production Plant» – power plant;

    «Production Unit» – power unit, turbine generator

    Х, W International code identifier 1 – international code
    Z Point Name

    (identification object)

    Full name of the power unit/turbine generator (up to 70 characters)
    Z Display Name

    (abbreviated name)

    Abbreviated name of the power unit/turbine generator (up to 16 characters)
    Z Eic Parent

    (parent code)

    EIC-code of W-type for power unit/turbine generator
    Z Eic Responsible

    (responsible party)

    EIC-code of Х-type for business entity – owner
    Z Function

    (functional role)

    Accounting Point
    Z International code identifier 0 – local code

     

    Plant Type in Ukrainian Plant Type in English – Full Name Plant Type in English – Abbreviated Name
    АЕС Nuclear Power Plant NPP
    ТЕС Thermal Power Plant ТPP
    ТЕЦ Combined Heat and Power Plant CHPPP
    ГЕС Hydropower Plant HPP
    ГАЕС Pumped Storage Hydropower Plant PSHPP
    Сонячна Photovoltaic Solar Power Plant PVSPP
    Вітрова Wind Power Plant WPP
    Біомаса Biomass-fired Power Plant BPP

    If a business entity has already received EIC-codes, but the content of their fields fails to comply with the above rules, it must contact the Local Issuing Authority with a request about making amendments.

    At the same time, please be informed that in order to comply with the requirements of paragraph 5.3 of Chapter 5 of Section ХІІІ of the CMC regarding the assignation of EIC-codes to consumers commercial metering points, which has to be accomplished by October 19, 2018, the Commercial Metering Administrator will develop a separate unified procedure and publish it afterwards.