Search
Search
Страницы
Записи
  • UA
  • EN
  • UA
  • Documents

    Looking for construction, reconstruction or operation standards in energy sector?

    Or, perhaps, you are an energy expert wanting to participate in a discussion of draft regulatory documents?

    You are in the right place, then: in this section, we publish effective sectoral documents regulating construction, repair and maintenance of power systems and frequency and capacity in Ukraine’s IPS. This information is continuously updated.

    We also publish draft regulatory documents and power grid development projects for discussion and your suggestions.

    Regulatory documents for organization of regulation of frequency and capacity in the Integrated Power System of Ukraine:

    METHODOLOGY OF CALCULATING AUTOMATIC FREQUENCY UNLOADING (AFU) IN THE IPS OF UKRAINE USING ABSOLUTE VALUE OF THE FREQUENCY AND FREQUENCY SPEED REDUCTION

    СОУ-Н ЕЕ ЯЕК 04.156:2009 “Main requirements to regulation of frequency and capacity in the IPS of Ukraine. Guideline”:
    Introduction
    Main part
    Structural scheme of functional ties in the system for automatic regulation of frequency and capacity in the IPS of Ukraine
    СОУ-Н ЕЕ 04.157:2009 “Methodologies and recommendations regarding organization of primary and secondary regulation of frequency and capacity at TPP (CHPP) power generators. Guideline”:
    Introduction
    Main part
    СОУ-Н ЕЕ 04.158:2009 “Methodologies and recommendations regarding organization of primary and secondary regulation of frequency and capacity at HPP. Guideline”:
    Introduction
    Main part
    СОУ-Н ЕЕ ЯЕК 04.159:2009 “Methodologies and recommendations regarding organization of primary and secondary regulation of frequency and capacity at NPP reactors. Guideline”:
    Introduction
    Main part
    СОУ-Н ЕЕ ЯЕК 04.160:2009 “Methodologies and recommendations regarding checks of TPPs’, HPPs’ and NPPs’ readiness for participation in regulation of frequency and capacity in the IPS of Ukraine. Guideline”:
    Introduction
    Main part

    To presume as an expedient one instead of the typical Terms of Reference to develop a feasibility study of a scheme of power distribution (for power stations) been published on an outdated SE NPC UKRENERGO website in 2013 while development of the out-of-stage works like “Capacity output schemes of power stations” and “External power supply schemes to consumers”. The customers should follow the requirements of СОУ-Н ЕЕ 40.1-00100227-103:2014 namely “Execution of the schemes for prospective development of the IPS of Ukraine, certain power centers and power districts. Rules”​​​.

    * available only in Ukrainian