Looking for construction, reconstruction or operation standards in energy sector?
Or, perhaps, you are an energy expert wanting to participate in a discussion of draft regulatory documents?
You are in the right place, then: in this section, we publish effective sectoral documents regulating construction, repair and maintenance of power systems and frequency and capacity in Ukraine’s IPS. This information is continuously updated.
We also publish draft regulatory documents and power grid development projects for discussion and your suggestions.
Methodology for assessing operational readiness of communication channels within the telecommunication network of SE NPC Ukrenergo
Process Management Standard of SE NPC Ukrenergo*
Technology policy of the SE “NPC “Ukrenergo” within trunk and interstate power grids development and operation”*
The methodology of analysis of the grid development projects costs and profit*
Commissioning of technically re-equipped or replaced components of operating facilities of trunk power grids without suspension of electricity transmission. Instruction*
Determination of necessary conditions and algorithms for considering WPP and SPP when installing emergency automatic devices aimed at preventing reliability failures (AZPS) at crossings of the IPS of Ukraine, the operational regime of which they influence. Methodological recommendations.*
General technical requirements for automated systems of control over technological processes at 220-750 kV substations of the IPS of Ukraine*
Regulatory documents for organization of regulation of frequency and capacity in the IPS of Ukraine*
Regulatory documents for organization of regulation of frequency and capacity in the Integrated Power System of Ukraine:
СОУ-Н ЕЕ ЯЕК 04.156:2009 “Main requirements to regulation of frequency and capacity in the IPS of Ukraine. Guideline”:
Introduction
Main part
Structural scheme of functional ties in the system for automatic regulation of frequency and capacity in the IPS of Ukraine
СОУ-Н ЕЕ 04.157:2009 “Methodologies and recommendations regarding organization of primary and secondary regulation of frequency and capacity at TPP (CHPP) power generators. Guideline”:
Introduction
Main part
СОУ-Н ЕЕ 04.158:2009 “Methodologies and recommendations regarding organization of primary and secondary regulation of frequency and capacity at HPP. Guideline”:
Introduction
Main part
СОУ-Н ЕЕ ЯЕК 04.159:2009 “Methodologies and recommendations regarding organization of primary and secondary regulation of frequency and capacity at NPP reactors. Guideline”:
Introduction
Main part
СОУ-Н ЕЕ ЯЕК 04.160:2009 “Methodologies and recommendations regarding checks of TPPs’, HPPs’ and NPPs’ readiness for participation in regulation of frequency and capacity in the IPS of Ukraine. Guideline”:
Introduction
Main part
To presume as an expedient one instead of the typical Terms of Reference to develop a feasibility study of a scheme of power distribution (for power stations) been published on an outdated SE NPC UKRENERGO website in 2013 while development of the out-of-stage works like “Capacity output schemes of power stations” and “External power supply schemes to consumers”. The customers should follow the requirements of СОУ-Н ЕЕ 40.1-00100227-103:2014 namely “Execution of the schemes for prospective development of the IPS of Ukraine, certain power centers and power districts. Rules”.
* available only in Ukrainian
Please submit your comments and proposals regarding the second version of “Technical operation of power plants and grids. Rules” to e-mail npcr-kanc@ua.energy by August 1, 2018.
Comments to the first version “Technical operation of power plants and grids. Rules (second version)”
Comments to the first version “Technical operation of power plants and grids. Rules (second version)”. Chapter 12
Explanatory note
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8
Chapter 9
Chapter 10
Chapter 11
Chapter 12
Reference